![]() |
|||||||
A Few Noteable MOSS Projects: |
||||||
![]() |
||||||
|
ALMCO STEEL PRODUCTS
Siding for the Almco building project featured Benchmark Designwall 2000 panels. The double gasket ship-lap joints of these panels provide a clean, aesthetic look, with maximum thermal efficiency. |
||||||
![]() |
||||||
| BIAGGI'S RESTAURANT
CECO hollow metal doors & frames, Eliason double acting doors, Falcon locks, and Bobrick toilet accessories complement the atmosphere at the Jefferson Pointe Biaggi's. |
||||||
![]() |
||||||
|
BENICOMP GROUP
Moss supplied general contractor Furman Steury with this NUCOR pre-engineered office building, doors, frames, hardware, toilet partitions/accessories and mezzanine joists for Benicomp Group. |
||||||
![]() |
||||||
| RAVE 16 MOVIE THEATER
Stadium seating in 16 motion picture theaters. Job required over 64 tons of rebar. |
||||||
![]() |
||||||
|
PARKVIEW NORTH HOSPITAL
MBP supplied VT wood doors, CECO hollow metal frames, and Corbin Russwin hardware for this project. |
||||||
![]() |
||||||
| FLAGPOLE FOR LARGEST FLAG
The USA's largest continually flying flag (50' x 80') needed a 200' flagpole with a base sturdy enough to manage the forces being applied to such a large piece of flying fabric. MBP provided the reinforcement bar and placement drawings to get the job done. |
||||||
![]() |
||||||
|
UNIVERSITY OF SAINT FRANCIS
MBP supplied Accurate Partitions, joists, deck, and Republic lockers for the new Doermer Hall educational facility. |
||||||
![]() |
||||||
| DUPONT HOSPITAL
MBP supplied VT wood doors, CECO hollow metal frames, and Corbin Russwin hardware for this project. |
||||||
|
Copyright © 2002 - 2008 Moss Engineering Corp. 2020 Lakeview Dr., Ft. Wayne, IN 46808
Ph: 260-432-0526 Fax: 260-436-4374, email: moss at moss-engineering.com Web site inquiries: webmaster at moss-engineering.com |
|